WARNING - By their nature, text files cannot include scanned images and tables. The process of converting documents to text only, can cause formatting changes and misinterpretation of the contents can sometimes result. Wherever possible you should refer to the pdf version of this document. ANNEX 1 - SECTIONS 14 AND 15: UPHOLDING OUTDOOR ACCESS RIGHTS Sections 14 and 15 give specific powers to the Park Authority to take action against land managers who utilise prohibition signs, obstructions and dangerous impediments, etc for the main purpose of deterring or preventing the exercise of access rights. (flow chart not available in full text format) ANNEX 2 - SECTION 23: REINSTATEMENT OF PATH SURFACE Land managers have a duty to restore within 14 days, the path surface of any core path or right of way that they disturb through ploughing or other husbandry. (flow chart not available in full text format)